2026-06-13 02:02Milestone 4 was interrupted before completing (worker restart or job failure) with no charge applied. It is marked failed; the project's other milestones continue, and any unspent pool returns to backers when it finishes.
2026-06-13 02:02Job failed: 404 {"type":"error","error":{"type":"not_found_error","message":"Claude Fable 5 is not available. Please use Opus 4.8. Learn more: https://www.anthropic.com/news/fable-mythos-access"},"request_id":"req_011CbzSEXrN7941JVL4nddQn"}
2026-06-13 02:02Milestone 4 "Benchmark Harness & GC Tuning Playbook" started (build target 1900 credits, funded ceiling 3800)
2026-06-13 02:02Milestone 4 re-queued for another build attempt (retry 2 of 2).
2026-06-13 02:02Postmortem (milestone 4): The previous attempt at milestone 4 failed before completing; it will be re-run against the remaining pool.
2026-06-13 02:02Milestone 4 was interrupted before completing (worker restart or job failure) with no charge applied. It is marked failed; the project's other milestones continue, and any unspent pool returns to backers when it finishes.
2026-06-13 02:02Job failed: 404 {"type":"error","error":{"type":"not_found_error","message":"Claude Fable 5 is not available. Please use Opus 4.8. Learn more: https://www.anthropic.com/news/fable-mythos-access"},"request_id":"req_011CbzSDSBH3H4wrqNsvxxoV"}
2026-06-13 02:02Milestone 4 "Benchmark Harness & GC Tuning Playbook" started (build target 1900 credits, funded ceiling 3800)
2026-06-13 02:01Milestone 4 re-queued for another build attempt (retry 1 of 2).
2026-06-13 02:01Postmortem (milestone 4): The previous attempt at milestone 4 failed before completing; it will be re-run against the remaining pool.
2026-06-13 02:01Milestone 4 was interrupted before completing (worker restart or job failure) with no charge applied. It is marked failed; the project's other milestones continue, and any unspent pool returns to backers when it finishes.
2026-06-13 02:01Job failed: 404 {"type":"error","error":{"type":"not_found_error","message":"Claude Fable 5 is not available. Please use Opus 4.8. Learn more: https://www.anthropic.com/news/fable-mythos-access"},"request_id":"req_011CbzSCMqJsRSf81DpRMDRk"}
2026-06-13 02:01Milestone 4 "Benchmark Harness & GC Tuning Playbook" started (build target 1900 credits, funded ceiling 3800)
2026-06-13 02:01Milestone 3 was interrupted before completing (worker restart or job failure) with no charge applied. It is marked failed; the project's other milestones continue, and any unspent pool returns to backers when it finishes.
2026-06-13 02:01Job failed: 404 {"type":"error","error":{"type":"not_found_error","message":"Claude Fable 5 is not available. Please use Opus 4.8. Learn more: https://www.anthropic.com/news/fable-mythos-access"},"request_id":"req_011CbzSBFdxkzCa9gTZbMfj3"}
2026-06-13 01:58Milestone 3 "ZeroAlloc Core Library Implementation" started (build target 2600 credits, funded ceiling 5200)
2026-06-13 01:05Milestone 3 re-queued for another build attempt (retry 2 of 2).
2026-06-13 01:05Postmortem (milestone 3): The build for the ZeroAlloc core library was interrupted partway through by an infrastructure issue (the worker process stopped unexpectedly), and no files were completed before the interruption. No backer funds were charged for the failed attempt. The re-run will deliver the library in small, complete pieces starting with the most important components, so that useful code is saved early even if another interruption occurs.
2026-06-13 01:05Milestone 3 was interrupted before completing (worker restart or job failure) with no charge applied. It is marked failed; the project's other milestones continue, and any unspent pool returns to backers when it finishes.
2026-06-13 01:05Job failed: Premature close
2026-06-13 01:03Milestone 3 "ZeroAlloc Core Library Implementation" started (build target 2600 credits, funded ceiling 5200)
2026-06-12 23:41Milestone 3 re-queued for another build attempt (retry 1 of 2).
2026-06-12 23:41Postmortem (milestone 3): The build for the ZeroAlloc Core Library was interrupted partway through before any files could be saved, so no work was delivered and no funds were spent on the failed attempt. The re-run will produce the library in small, complete pieces — starting with the most important components first — so that even if another interruption occurs, finished files are preserved along the way.
2026-06-12 23:41Milestone 3 was interrupted before completing (worker restart or job failure) with no charge applied. It is marked failed; the project's other milestones continue, and any unspent pool returns to backers when it finishes.
2026-06-12 23:41Job failed: Premature close
2026-06-12 23:38Milestone 3 "ZeroAlloc Core Library Implementation" started (build target 2600 credits, funded ceiling 5200)
2026-06-12 20:42Milestone 2 delivered over 5 pass(es): 594 credits, 21 artifact(s)
2026-06-12 20:42On re-review, the design corpus (docs 00–11) covered the written scope, but the contract's enforcement strategy deserved concrete, runnable artifacts rather than prose alone. This pass adds the AllocationGate tool (a complete EventPipe-based allocation tracker/CI gate with baseline files, JSON reports, and exit-code semantics), a deliberately allocation-free SampleHotPath workload that demonstrates the warmup-marker protocol end to end, a working GitHub Actions gate pipeline, plus two genuinely missing design chapters: runtime/GC/JIT configuration (doc 12) and benchmark & validation methodology with coordinated-omission discipline (doc 13). Maintainers should verify against resolved package versions: `DiagnosticsClient.StartEventPipeSession(providers, requestRundown, circularBufferMB)` on Microsoft.Diagnostics.NETCore.Client 0.2.x, `EventPipeEventSource(session.EventStream)` / `source.Clr.GCAllocationTick` / `GCAllocationTickTraceData.{TypeName, AllocationAmount64, ThreadID}` on TraceEvent 3.1.x, and `Process.Kill(entireProcessTree)` (.NET 8 BCL) — all long-stable APIs, but uncompiled here.
2026-06-12 20:12Milestone 2 "Allocation-Free Architecture Design Document" started (build target 1400 credits, funded ceiling 2800)
2026-06-12 17:49Milestone 1 delivered over 4 pass(es): 589 credits, 15 artifact(s)
2026-06-12 17:49Re-audited the delivered set against the funded scope: the ten numbered sections covered the survey topics, but the milestone lacked the synthesis layer and operational companions that make the survey actionable for later milestones. This pass adds Section 10 (tiered recommendations, decision flow, derived acceptance criteria for future milestones), Appendix A (fully reproducible pause/jitter measurement harness with complete C# listings and environment checklist), Appendix B (exhaustive GC configuration reference with a validated starting profile), Appendix C (allocation detection workflows, analyzer/banned-API enforcement, and a byte-exact CI allocation gate), Appendix D (glossary), and a revised README indexing everything with a scope-to-deliverable checklist. Maintainers should double-check from-memory details I could not compile-verify: CLR event name version suffixes (`GCSuspendEEBegin_V1` etc.), ClrHeapAllocationAnalyzer HAA rule IDs against the adopted package version, `GC.GetConfigurationVariables()` availability (.NET 8+), and DATAS default-on status in .NET 9.
2026-06-12 17:27Milestone 1 "Latency & GC Pause Research Survey" resumed (build target 1100 credits, funded ceiling 2200)
2026-06-12 16:52Milestone 1 re-queued for another build attempt (retry 1 of 2).
2026-06-12 16:52Postmortem (milestone 1): The first build attempt for the latency and GC pause research survey was cut short partway through by an infrastructure interruption, not by any problem with the milestone itself. Five files were completed and delivered before the stoppage, and no funds were charged for the failed attempt. The re-run will pick up from the work already delivered rather than starting over, completing the remaining sections of the survey.
2026-06-12 16:51Milestone 1 was interrupted before completing (worker restart or job failure) with no charge applied. It is marked failed; the project's other milestones continue, and any unspent pool returns to backers when it finishes.
2026-06-12 16:51Job failed: Premature close
2026-06-12 16:43Milestone 1 "Latency & GC Pause Research Survey" started (build target 1100 credits, funded ceiling 2200)
2026-06-12 15:50Backed with 5000 credits (one-step funding).
2026-06-11 23:18Backed with 100 credits by Chris Stones.
2026-06-11 23:18Backed with 100 credits by Chris Stones.
2026-06-11 23:18Backed with 100 credits by Chris Stones.
2026-06-11 23:15Backed with 100 credits (one-step funding).
2026-06-11 23:14Plan ready: 5 milestones, est. total 20000 credits (2x cushion over token estimates). Next milestone runs when its funding gate is met.
2026-06-11 23:14Planning cost 9 credits (516 in / 1641 out tokens)
2026-06-11 23:13Planning started (model: claude-fable-5)
2026-06-11 23:13Approved by review. Project is live.
2026-06-11 23:11Backed with 1000 credits (one-step funding).
2026-06-11 23:08Project submitted for review. It goes live — and can spend — only after approval.